← Back to Journal

Permits & Legal

Plans and the Permit

May 1, 2026

Early 2026 was the paperwork chapter. The architect work came together over a few months, and on May 1, 2026 Swain County issued the building permit. After the bond and the temporary power pole, it was finally official: I can build.

It does not look like much - a stamped set of plans and a permit on the wall - but everything before this was preparation. The next entries in this journal will have concrete in them.

Photos from this trip

Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit
Plans and the Permit

An unhandled error has occurred. Reload